|
17 Heidts 2-inch-drop spindles are installed next, tied to the upper and lower ball joints. Because this is mock-up phase, nothing gets cotter pins. However, when it's time for final assembly, never walk away to take a break. Tighten all castle nuts completely and install all cotter pins properly before walking away. This minimizes any chance of forgetting to tighten everything. View Related Article
|
|