|
This rear framerail bracket is first, as shown. Because it uses the forward leaf spring mount bolt, location is indexed off of this bolt. Bolt the bracket in place snugly, but not tight, and drill the three mounting holes using a 7/16-inch drill bit. Begin with a small 1/4-inch pilot hole. Use the Grade 8 hardware provided to secure the bracket. View Related Article
|
|